Follow Us


Latest News

View our recent articles

Get in Touch

Tel: 01322 552 450

 

24/7 Callout Response:

0800 783 5921

 

Email: general@fujitec.co.uk

Fujitec Major Projects

Fujitec is a global supplier of lifts, escalators and travelators. Our UK group has been involved in many major projects, including modernising the lifts in HSBC’s prestigious Canary Wharf headquarters.

  • Slide title

    Write your caption here
    Button

The HSBC tower was one of the most exciting projects we have worked on here in the UK….

8 Canada Square is a 45-story skyscraper in London and is the world headquarters of HSBC, one of the world's largest banks!

The tower was built on reclaimed land, in an area of London that used to be home to the world's largest docks.


Objective: New Build Major Projects

Number of lifts: 35 - High Speed

Lift Type: High rise Traveling up to 7m/s

Escalators: 13 Heavy Duty

Completion: Early 2000


Discover the Gallery
  • Slide title

    Write your caption here
    Button

Christ Church Court, Sancroft

Christ Church Court marked the first phase of Paternoster Square and initiated a break-away from the William Holford-designed masterplan that had locked together all the buildings from the post-World War II redevelopment north of St Paul’s Cathedral. Peakmoor was the stone of choice as it is a warm buff sandstone with technical properties that enabled it to maintain the smart clean lines of the columns and façade. An impressive commercial development that will stand the test of time.


Objective: Full Turnkey

Number of lifts: 14

Architects: Rolfe Judd Limited

Completion: 2022

  • Read More

    One Group of 8 with DFGS and Speed Gate Interface 


    One Heavy Duty Simplex Goods lift


    One Goods Platform Lift


    One Cycle Platform Lift 


    Three Simplex Firefighting Lifts

Discover the Gallery
  • Slide title

    Write your caption here
    Button

50 Electric Boulevard

Battersea

50 Electric Boulevard, a new 200,000 sq ft workplace at Battersea Power Station has been designed with wellbeing and smart tech at its heart,


Elevating employee experience and catering for the future of work, the site offers, Fujitec have delivered 14 Units in a 16 Storey Building featuring a Group of 6 Rexia MRLs with DFGS (Hall Call) Speed Gate and smart building interface Interface.


Group Of 6 with DFGS & Speed Gate Interface


L1 15 Stop Rexia MRL 1600 KG 2.5 m/s

L2 15 Stop Rexia MRL 1600 KG 2.5 m/s

L3 13 Stop Rexia MRL 1600 KG 2.5 m/s

L4 13 Stop Rexia MRL 1600KG 2.5 m/s

L5 16 Stop Rexia MRL 1600KG 2.5 m/s

PFL6 16 Stop serving 32 Entrances Rexia MRL 1600KG 2.5 m/s

X 2 Duplex Pair

CL1 Rexia MRL 2000KG 1.0m/s

CL2 Rexia MRL 2000KG 1.0m/s

SH1 Traction MRL 1600KG 1.0 m/s

SH2 Traction MRL 1600KG 1.0 m/s

3 Simplex Lifts

FL2 Traction MRL 630KG 1.6m/s

RG3 Traction MRL 2500KG 1.0 m/s

RG4 Traction MRL 2500KG 1.0 m/s

Discover the Gallery
  • Slide title

    Write your caption here
    Button

135 Park Street

The new mixed-use development extends the cultural regeneration of Bankside eastwards, drawing

activity from Tate Modern and the Globe Theatre.

A mixture of commercial and affordable workspace is provided over eleven floors, accessed via

Emerson Street, with the retail unit addressing Park Street. Generous outside terraces with planting

feature on the upper levels, whilst the new colonnade at street level creates an animated pedestrian

route.

  • Read More

    Group Of 6 with DFGS & Smart Building

    Integration


    L1 11 Stop Rexia MRL 1600 KG 2.5 m/s

    L2 14 Stop Rexia MRL 1600 KG 2.5 m/s

    FL3 13 Stop serving 26 Entrances Rexia

    MRL 1600 KG 2.5 m/s

    FL4 25 Stop Rexia MRL 1600KG 2.5 m/s

    L5 12 Stop Rexia MRL 2000KG 2.5 m/s

    G1 13 Stop serving 26 Entrances Rexia

    MRL 1600KG 2.5 m/s

    X 1 Simplex Goods

    G2 2 Stop, Rexia MRL 1275KG 1.0m/s

    X 2 Platform Specials

    L6 – 2 stop 400KG Platform Lift, 0.15m/s

    L7 – 3 Stop 400KG Platform Lift, 0.15m/s

Gallery Unavailable
Share by: